The objectives of the project were to locate and solve critical points on the network and simulate planned extensions and new timetables.
Model of the DC traction network plus the AC medium voltage grid. Importation of the schedules directly from the VDV452. The following problems are solved using the simulation tool: - Is the voltage of the contact wire within the values defined in EN50163? - Are additional substations needed in the infrastructure? - What is the effect of the DC traction network on the AC medium voltage network? - What is the impact of the new timetable on the infrastructure?
Simulated
Substations
Lines