Gdynia trolleybus & e-bus

Gdynia trolleybus & e-bus

The objective of the project were to electrify the corridor from Gdynia centrum to Witomino. Analyse which is the best option: run the corridor with electric buses or extend the OCS from Centrum to Witomino to run with trolleybuses.

Description of the project:

Create the model of the trolleybus network plus the batteries in buses. Validate the charge and discharge of battery buses for line 190. The following questions can be solved: - Which is the maximum temperature of the contact wire? - Is the voltage of the contact wire within the values defined in EN50163? - How much braking energy can be reused to charge electric buses? - Which is the effect on the network (temperature and voltage) when the system runs in normal and degraded mode (1 substation disconnected)?

30 km

8

7

Simulated

Substations

Chargers